Bathroom Remodel Side Job

Hall bathroom remodel. Window, tub, ceiling, and sub floor stayed. New tile, paint, drywall, fixtures, cabinet, lights, fan, baseboard, and hardware. All work and design done myself with some helpers.
More June 10

  • Ac3805f6ffe6354ff3b74252e5ea889c
    Hall bathroom remodel. Window, tub, ceiling, and sub floor stayed. New tile, paint, drywall, fixtures, cabinet, lights, fan, baseboard, and hardware. All work and design done myself with some helpers.
  • D632434a2c41a233cc1e6ed6b4161d4a
    Hall bathroom remodel. Window, tub, ceiling, and sub floor stayed. New tile, paint, drywall, fixtures, cabinet, lights, fan, baseboard, and hardware. All work and design done myself with some helpers.