Furnace relocated about ten feet back from original spot. Moved ductwork (supply and two side returns) to the other side of the I beam. All metal was pre-measured with original equipment in place.
More August 5

  • 2013 08 05 04 43 06  0000
    Furnace relocated about ten feet back from original spot. Moved ductwork (supply and two side returns) to the other side of the I beam. All metal was pre-measured with original equipment in place.