2009-2010 | Welder/Ironworker
Beefed up and expanded Cat Cracker structure before the replacement of the Cat at Valero in Norco, Louisiana.
2011-2011 | Journeyman Welder/Fabricator
Welded all plates and h pile tension connectors. Rigged out all equipment barges for Cranes and excavators. Fabricated 8 skip pans for the job site.
2011-2013 | Welder / Ironworker
Erected Heater and Super Heater as well as set all equipment. Welded seams, steel members and miscellaneous pipe supports ad needed. Ran hydros did punch list and cimmissioning for.HCU LEU project at Valero in Norco, Louisiana.
2013-2014 | Welder/ Iron Worker
Erected and welded steel members and pipe supports as needed.. Ran packages set up for all pneumatic testing and hydros. Did punchlist item and sold to third parties during commissioning.
2014-Present | welder/ ironworker
Erected and welded platforms at Williams IN Geismar Louisiana. Transferred to Methanex where I erected.all pipe racks in G2 unit.